
English
11
4. Choose the World Geodetic System or the country where
your field operations will take place.
5. In the field just underneath, choose the datum used
6. In the field just underneath, choose the projection used.
7. Choose the vertical datum in the last field. The default
possible choices are:
– Ellipsoid: Each altitude or height value is simply
determined with respect to the selected ellipsoid
(second field above).
– EGM84: Each altitude or height value is still initially
determined with respect to the selected ellipsoid but a
correction is applied to that value. The correction is
read from the EGM84 geoid (Earth Geoid Model 1984,
a global geoid model) and is specific to the computed
horizontal position.
Other geoid models may be downloaded to the receiver via
the ProMark Field CD from the Ashtech website. Once
downloaded, they are made available as possible choices
in the Vertical Datum field.
8. Tap OK to complete the job creation procedure. The
software closes the currently open job and opens the new
one instead.
NOTE: If none of the available horizontal systems and vertical
datums are suitable, then you can create a specific
coordinate system by tapping New on the coordinate system
selection screen. To create a new coordinate system, see
Defining a User System on page 12.
Subsequent Uses
of ProMark Field
The next time you launch ProMark Field, the program will
open the job you last opened.
If this job is no longer present in the receiver, then a message
will warn you that the program has been unable to open any
job. You will then have to create a new job or open an existing
one.
Kommentare zu diesen Handbüchern